Spacecraft data:
| Prime contractor | |
| Customer | |
| Platform | |
| Mass at launch | 9500 kg? |
| Dry Mass | kg |
| Basic shape | |
| Dimension | |
| Solar array | |
| Stabilization | |
| DC power | |
| Design lifetime | |
|
Mission details:
The first Delta 4H launch in Dec 2004, with a demonstration satellite,
suffered from early cutoff of the Common Booster Core stages, and the
SECO-1 orbit was lower than planned (the apogee was around 105 km) and two nanosatellites
reentered immediately. The Delta 4H recovered and put the demonstration
satellite in a near-synchronous orbit with a 10 degree inclination,
running out of fuel in the process; this delayed further Delta 4H launches (until Nov 2007).
External links:
|
Ref.: #3(SD), #7(JR588), #14, #228 - update: 26.07.16 |
Home |
|